To the central content area

Improvement Plan for Soil Pollution Control Sites with Appropriate Measures for Farmland Soil Pollution Control Sites with 2 land numbers, 28-14, 28-15, Niuyunhou Section, Nantou City, Nantou County (

Absrtact
The working period of this project is from October 14, 2019 to July 30, 2020. The farmland within the scope has 2 land numbers, 3 hills and an area of 0.2710 hectares. According to the principle of determining the type of dumping established in this plan, when assisting in the on-site XRF screening operation, it can quickly screen out S01 or S02 contaminated earth, further reducing the amount of S02 contaminated earth, so as to effectively limit the amount of leaving earth. The benefit of the austerity of the expenditure on the land. The main planning and construction methods are based on the "passenger soil method", and the improvement target is the soil pollution control standard for general land or edible crop farmland. The plan totals 711.24 tons of soil, including 603.26 tons of soil contaminated by S01 and 107.98 tons of soil contaminated by S02. It was verified and passed in June 2020 and completed the restoration work of this project in July 2020. The follow-up will assist in handling related work of delisting.
Keyword
soil, heavy mental, remediation, soil turn-over dilution, soil excavation, soil fertility recovery
Open
top